Process Cooling Provided for Leading Vegetable Oil Supplier

A UK leading edible oil supplier recently required emergency process cooling to ensure business as usual.

All Seasons Hire were recently contacted by a UK leading supplier of vegetable oils. Failure of their existing chiller had left them in desperate need of a temporary solution to prevent their supply from spoiling.

200-300kw BicoldWithin hours of receiving the call All Seasons Hire were on site for an in depth site survey. It was decided that a 200 kW chiller with integral water tanks and pump would be sufficient.

During install All Seasons Hire drained the existing system into 3 1,000 litre IBC containers. The temporary chiller was then installed before the clients system was refilled using a liquid transfer pump.

Unlike other hire companies that offer off the shelf equipment All Seasons Hire can provide full, bespoke installation equipment including pipe mods and system drain down.

The client’s system was operational within 24 hours of the initial enquiry, this ensured minimal impact to profitability and production and ensured a quick return to business as usual.

Check out more of our case studies here.

Written by Ryan Hill

Pictures of the job (click to enlarge):

200 kW Chiller 2
200 kW Chiller 3
200 kW Chiller 4 redo
200 kW Chiller 5
200 kW Chiller 1

Continue reading

SHARE THIS POST ►