Art Deco Offices Require Temporary Air Conditioning

 

When this prestigious central London office complex’s air conditioning broke down, help was just a phone call away.

Time was of the essence and All Seasons Hire were contacted to get the system up and running again as fast as possible.

An experienced engineer was sent in to evaluate the situation. He specified modifications to the existing pipework that would enable temporary chillers to be stabbed straight into the system which would enable a quick and efficient install.

Liaising with headquarters a specialist welding team was sent onsite that same day to modify the pipework ready for the chillers connections. The team of welding and pipework engineers worked through the night to complete the work so that it would be ready for the delivery of the 2 x 500kW chillers required.

The chillers and flexible pipework were delivered at 6.00 am the following morning where the engineers connected them into the newly fabricated stabbings as planned.

The accurate assessment of the situation coupled with an experienced team of welders and fitters had ensured a no fuss install and the offices air conditioning to be up and running within 24 hours of the initial call, and an installation achieved well ahead of the clients expectations.