All Seasons Hire Provide Temporary Heating to Grade 1 Listed Building

When renewal of an existing boiler and the replacement of a deteriorating flue were desperately needed All Seasons Hire were contacted for help.

A comprehensive survey took place and 1800kw of heating was estimated to be required to heat the listed building with a further 600kw required for hot water. A 1.2mw and 2 x 600Kw Boilers were soon on their way along with a low loss header and hoses.

A sympathetic approach was taken at install with the team taking great care to cause minimum disruption to the building and its staff. The replacement of the Boiler and rebuild of the flue is estimated to take approximately 6 to 8 weeks.

Twin Pic

Another example of All Seasons Hire providing professional surveys and installation of temporary heating to complex and demanding situations. Should you require our help, please contact us to discuss your project or book a free site survey.

 

 